Service area · Tanger
Solar installation in Tanger
Tangier receives ≈ 2,800 h of sun a year — the lowest figure of our five cities, and a strait swept by wind. All the more reason to calculate rather than promise: Taqinor sizes your installation on your bill, not on a flattering average.
Solar potential
≈ 2 800 h/year
Indicative annual sunshine · Tanger
Public weather data, for guidance only. Further north, more humid, windier: the Tangier North gets a little less sun than the centre of the country, and those ≈ 2,800 h reflect it. That is precisely why the orientation and tilt of your roof weigh more here — the assessment optimizes them.
- 50–100 %
- Of the bill covered
- 3–7 years
- Return on investment
- 25 years
- Performance warranty
- < 11 kW
- Simple Law 82-21 declaration
At ≈ 2,800 h a year, Tangier has the lightest resource of our five cities: for an identical system size, that leans toward the upper end of the 3–7 year band — one more reason to get the tilt and orientation right instead of counting on the weather alone.
Tangier is served by Amendis (progressively being taken over by the regional SRM, 2025–2027): we check your tariff bracket on your statement before pricing your installation.
Your city is covered
We work in Tanger — and our projects speak for us
Tangier lies north of the Casablanca-Settat region, where all our already-serviced installations are concentrated — same assessment methods, same tier-1 equipment, same real-time production monitoring, whatever the distance. Here are our closest projects:
Less sun: even more calculation
When the resource is more measured, every misaligned watt is paid for. We set the tilt and azimuth on your Tangier roof, on your readings — and the founder, a doctor-engineer, validates before the install.
Wind, but firm figures
Structure anchored for the gusts of the strait, production followed in real time with your access: you read the real kWh, month after month, without having to take them on trust.
Law 82-21: declaration and filing
For an installation in Tangier, declaration or regularization, we prepare and submit the file. See the regimes →
Free study
In Tangier, a well-oriented roof beats a large, poorly fitted array: let’s do the assessment first.
Get my free studyFree · No obligation · Reply within 24–48 h · On WhatsApp