Ref. NC-10/25 · Nouaceur · octobre 2025

3,72 kWc of solar installation in Nouaceur

An installation in Nouaceur, on the outskirts of Casablanca: six JA Solar panels fitted with the same care of layout as our larger projects.

3,72 kWc
Installed power
6 × JA Solar
Panels fitted
Nouaceur
Casablanca-Settat

The project, told

Why 3,72 kWc, on this roof

In Nouaceur, on the outskirts of Casablanca, a 3.72 kWc installation: six JA Solar panels, fitted with the same care of layout as on our larger projects, on a roof that asked for no more.

Six JA Solar modules for 3.72 kWc: the power answers the household’s real need, and honesty dictates not installing beyond what consumption justifies. The rail layout and the alignment are computed here with the same rigour as at 17 kWc.

Fitted in October 2025, the installation follows our standard of layout and upkeep, with the same real-time production monitoring available, client access included, as on our other projects.

The project on film

Watch the project on video

Équipe Taqinor au travail sur le chantier solaire de Nouaceur

The project in phases

Before · During · After

Installer in a Taqinor vest fitting a structure’s rails, Nouaceur
Marking out and tape measurement of the fixing rails on the roof, Nouaceur
Jet cleaning of the panel array, Nouaceur

The equipment fitted

What is really on the roof

The file’s photos and video show the groundwork: Taqinor installers set out the ballast blocks and the structure’s rails, a team measures out the layout with a tape before fitting the modules, then the jet cleaning of the array once the panels are in place. Indoors, the MUST inverter sits next to the electrical enclosure. It is this invisible preparation that holds an installation over time.

Panels6 × JA Solar

Tier-1 brands sourced through official distributors in Morocco — local warranties activatable. See all the equipment →

From the file

The project, as it is

Two Taqinor installers set the ballast blocks and rails before fitting the panels, Nouaceur
Taqinor vest and mounting rails being aligned on the roof, Nouaceur
Three Taqinor installers measure the rail layout on the roof, Nouaceur
MUST solar inverter fitted on an interior wall, next to the electrical enclosure, Nouaceur
Close-up of the six solar panels aligned at dusk, Nouaceur
Installer in a Taqinor vest fitting a structure’s rails, Nouaceur
Marking out and tape measurement of the fixing rails on the roof, Nouaceur
Jet cleaning of the panel array, Nouaceur